EXTENSION OF CABINS IN THE M/V GALAPAGOS LEGEND – 2007
Modification of the upper cabins in 5086 naval aluminum. The sides of the cabins of this classified vessel were moved to obtain more space. All work was done while browsing…
Modification of the upper cabins in 5086 naval aluminum. The sides of the cabins of this classified vessel were moved to obtain more space. All work was done while browsing…
Engineering and Construction of a self-propelled barge to cross from the mainland to the Muisne Island. It was built with a cross-type structure and was delivered on site on Muisne…
The very illustrious Municipality of Calceta had the need of building a barge to work in the dam Esperanza. We designed, calculated and executed the job obtaining a selfpropelled barge…
Design, calculations and implementation of the reactivation, modification and repotentiation of a Tug that was abaned for several years. The whole Stern was modified to be able to fit 2…
The ROBERT H project involved transforming (modifying, repowering and adapting) this tug of a single propulsion line into a tug of two propulsion lines. This job was done for Port…
In the B / P Arrecife project, the vessel was extended to expand its storage capacity, in addition to repairing a large previous stability problem due to previous lengthening work.
A barge was built to cover the Guayaquil - Galapagos route