EXTENSION OF CABINS IN THE M/V GALAPAGOS LEGEND – 2007

Modification of the upper cabins in 5086 naval aluminum. The sides of the cabins of this classified vessel were moved to obtain more space. All work was done while browsing

Cutting and securing of removed areas
Opening from the inside
Preparation and assembly of the new sections
Work supervision
Plasma cutting in hard to reach areas
Night shift
Night shift opening another cabin
Final result of the master deck welded with the MIG system
Making the contribution of the welding with its respective sequence, to avoid deformations

Leave a Reply