In the B / P Arrecife project, the vessel was extended to expand its storage capacity, in addition to repairing a large previous stability problem due to previous lengthening work.
The following jobs were done in this project:
- A survey was made and the plans were made and the respective calculations were made
- The side was enlarged in the middle section at the height of the Chinese and the bottom
- Balance guards were placed at the sides
- The propulsion line was extended with a new section
- The tunnel was reinforced and restructured
- The mast was lengthened and its fishing gear relocated
- Hull protection: sandblasted and painted
- Testing and delivery




Momentos del corte del casco y su posterior abertura del mismo


Cortando la china, union de costado y fondo para después ensanchar


Estructuración de bulárcamas de fondo, costado y baos en el área alargada




Montaje de china y guardabalance a los costados y en área alargada