B/P Arrecife

In the B / P Arrecife project, the vessel was extended to expand its storage capacity, in addition to repairing a large previous stability problem due to previous lengthening work.

The following jobs were done in this project:

  1. A survey was made and the plans were made and the respective calculations were made
  2. The side was enlarged in the middle section at the height of the Chinese and the bottom
  3. Balance guards were placed at the sides
  4. The propulsion line was extended with a new section
  5. The tunnel was reinforced and restructured
  6. The mast was lengthened and its fishing gear relocated
  7. Hull protection: sandblasted and painted
  8. Testing and delivery
Al momento de entrar al varadero

Momentos del corte del casco y su posterior abertura del mismo

Cortando la china, union de costado y fondo para después ensanchar

Estructuración de bulárcamas de fondo, costado y baos en el área alargada

Montaje del planchaje de la cubierta en el área abierta
Montaje de costado

Montaje de china y guardabalance a los costados y en área alargada

Montaje de camisa del tipo media caña en el eje principal
Momentos de terminado la aplicación del plan de pinturas de protección antes de desvarar
Antes de la maniobra de desvare del pesquero
Después de efectuar las respectivas pruebas de mar, se alcanzaron los objetivos, de aumentar la capacidad de bodega y mejorar la estabilidad de la embarcación